We plan installation around your site, from positioning and connection checks to initial start-up.

Discuss Installation
Our Approach

Installation begins with the right location

Site preparation matters as much as generator capacity. We consider access, ventilation, exhaust routing, service clearances and electrical infrastructure together. This clarifies equipment supply and site-work responsibilities before installation begins.

What we consider

Service Scope

Positioning and access

Equipment dimensions, delivery route, foundations and maintenance space are reviewed against site conditions.

Mechanical infrastructure

Airflow, exhaust discharge, vibration and fuel arrangements are identified, with scope defined for the project.

Electrical connection plan

Transfer panel, cable routing, protection and earthing requirements are coordinated with the relevant project teams.

Checks and commissioning

Installation checks, operating scenario tests and user handover are included in delivery planning.

Step by step

How We Work

  1. Review the site

    Identify requirements using the layout, equipment details and existing infrastructure.

  2. Agree on the programme

    Define the scope and responsibilities for transport, lifting, infrastructure and connections.

  3. Check and hand over

    Complete the agreed inspections and commissioning steps, then share operating information.

Before We Talk

Sharing these details helps us assess your requirements more quickly.

  • Site address and photographs
  • Generator model, dimensions and weight
  • Panel location and existing electrical drawings
  • Target delivery date and site access

Frequently Asked Questions

Can an existing generator be installed or relocated?

Installation or relocation can be assessed after reviewing the equipment’s specifications, condition and the new site.

Are transport and infrastructure works included?

Transport, lifting, foundations, cables, panels and mechanical work vary by site. The quotation identifies included items and responsibilities separately.

When does commissioning take place?

It is planned after site preparation and connection checks are complete. Initial start-up and transfer scenarios are assessed against the equipment and facility requirements.